Back to Projects

First Horizon National Corporation Operations Project

FIRST HORIZON NATIONAL CORPORATION (FHNC)

FHNC wanted to consolidate employees from three different buildings into two locations. The goal was to reduce real estate, improve functional layouts to increase collaboration and work-flow while giving employees a flexible, modern work environment. In the early stages of design ANF Architects (Architect of Record) created a virtual cloud office that allowed real-time collaboration with Gensler and the entire A/E team in a shared 3D (BIM) model.

The $25 million dollar FHNC Operations project, represents one phase of a $60 million dollar multifaceted comprehensive design solution for the corporate offices of the largest bank headquartered in Tennessee. This 190,000 SF building was designed for ultimate flexibility and transformed an old check processing facility into a state-of-the-art tech center. This center operates continuously over a 24 hour cycle and can accommodate a staff of 700 people.


Interesting Facts About First OPS:
• design phasing allowed continuous bank operations & seamless transitions for uninterrupted customer service
• includes renovations & new construction 
• project includes two large meeting spaces for corporate wide meetings & collaborative areas
• state-of-the-art conference room reservation system
• New Additions Include: 
         • a full-service cafeteria with outdoor patio
         • a fitness center with showers and lockers
         • loading docks
• Site Improvements Include:
         • improved site security 
         • addition of an employee jogging trail
         • additional parking to accommodate a total of 700 employees

 

https://www.bizjournals.com/memphis/news/2017/05/05/see-inside-25-million-reno-takes-massive-warehouse.html

http://www.bizjournals.com/memphis/news/2015/10/15/first-tennessee-moving-200-employees-to-downtown.html

Posted by Eli Cloud at 2:34 PM

1500 Union Avenue
Memphis, TN 38104

901-278-6868

Receive Our Event Invitations